白丝美女被狂躁免费视频网站,500av导航大全精品,yw.193.cnc爆乳尤物未满,97se亚洲综合色区,аⅴ天堂中文在线网官网

Method for data communication, system for communication and related devices

專(zhuān)利號(hào)
US10009934B2
公開(kāi)日期
2018-06-26
申請(qǐng)人
Huawei Technologies Co., Ltd.(CN Shenzhen)
發(fā)明人
Lan Liu; Wanqiang Zhang
IPC分類(lèi)
H04M1/00; H04W76/02; H04W8/18; H04W8/24; H04W72/04; H04W92/02; H04W8/08; H04W76/11; H04W48/18; H04W88/16
技術(shù)領(lǐng)域
bearer,ue,sgsn,pgw,mme,ti,pdp,default,request,message
地域: Shenzhen

摘要

A data communication method, a communication system, and related devices are configured to establish a transaction identifier (TI) in a user equipment (UE). The data communication method includes the following steps. A mobility management entity (MME) receives a request message and obtains ability information of the UE. If the UE has an ability to access a Universal Terrestrial Radio Access Network/GSM/EDGE Radio Access Network (UTRAN/GERAN), the MME generates the TI. A communication system and related devices are also provided. Thus, the TI is effectively established in the UE, so as to ensure normal processing of the UE.

說(shuō)明書(shū)

Steps 408 to 410 may be summarized as follows: The RAN node returns a Bearer Setup Response to the MME, and the MME creates a Create Bearer Response message to the PGW.

In this embodiment, during the resource requesting process, the MME may assign the TI to the UE, enabling the UE to obtain the TI, so that the UE can still perform normal processing after moving to the GERAN/UTRAN.

A4. PDN Connection Request Process Initiated by a UE

In a fourth embodiment, as shown in FIG. 5, a flow chart of requesting the PDN connection by the UE is described.

In step 501, the UE establishes a PDN Connectivity Request, and sends the PDN Connectivity Request to an RAN.

In step 502, the RAN forwards the PDN Connectivity Request established by the UE to an MME.

In step 503, the MME creates a Default Bearer Request and sends the Default Bearer Request to an SGW.

In step 504, the SGW forwards the Default Bearer Request created by the MME to a PGW.

In step 505, the PGW creates a Default Bearer Response to the SGW.

Steps 501 to 505 may be summarized as follows: The UE sends a PDN Connectivity Request message to the MME, the MME initiates a default bearer establishing procedure to the PGW after selecting the PGW and the SGW, and the PGW responds and creates a Default Bearer Response message and sends it to the MME.

In step 506, the SGW forwards the Default Bearer Response created by the PGW to the MME.

In the step, after receiving the created Default Bearer Request message, the MME sends a Bearer Setup Request to an RAN node.

權(quán)利要求

1
微信群二維碼
意見(jiàn)反饋