The invention claimed is:1. A communication device operational as a first node in a communication system including a user terminal and a second node, the communication device comprising:circuitry configured to cause communication with the user terminal with multiple component carriers, the communication including:obtaining a downlink component carrier as a downlink primary component carrier for communication with the user terminal,changing the downlink primary component carrier only in a condition of a handover,obtaining an uplink component carrier for receiving a Physical Uplink Control Channel (PUCCH) from the user terminal,transmitting, via Radio Resource Control (RRC) signaling, designation information regarding an uplink primary component carrier to override an uplink primary component carrier set as a default uplink primary component carrier by the user terminal, andsetting an uplink component carrier with a highest or lowest frequency point as the default uplink primary component carrier.2. The device according to claim 1, wherein the circuitry is configured to receive PUCCH signals from the user terminal on the uplink component carrier.3. The device according to claim 1, wherein the first node is a macro base station and the second node is a low power node (LPN).4. The device according to claim 1, wherein the first node operates at a first frequency and the second node operates at a second frequency higher than the first frequency.5. The device according to claim 1, wherein the first node and the second node are in a common baseband with each other.6. A method of performing wireless communication with a user equipment with multiple component carriers, the method comprising:obtaining a downlink component carrier as a downlink primary component carrier for the communication with the user terminal;changing the downlink primary component carrier only in a condition of a handover;obtaining an uplink component carrier for receiving a Physical Uplink Control Channel (PUCCH) from the user terminal; and transmitting, via radio Resource Control (RRC) signaling, designation information regarding an uplink primary component carrier to override an uplink primary component carrier set as a default uplink primary component carrier by the user terminal; andsetting an uplink component carrier with a highest or lowest frequency point as the default uplink primary component carrier.7. The method according to claim 6, further comprising:transmitting designation information regarding the uplink component carrier, via one of Media Access Control (MAC) signaling, or physical layer signaling.8. The method according to claim 6, further comprising:receiving PUCCH signals from the user terminal on an uplink primary component carrier.9. A communication device operational as a second node in a communication system including a first node and a user terminal, the communication device comprising:circuitry configured to cause communication with the user terminal with multiple component carriers, the communication including:obtaining an uplink component carrier for receiving Physical Uplink Control Channel (PUCCH),receiving, using the circuitry, an uplink control signal on the PUCCH via an uplink component carrier,transmitting, via Radio Resource Control (RRC) signaling, designation information regarding an uplink primary component carrier to override an uplink primary component carrier set as a default uplink primary component carrier by the user terminal, andobtaining an uplink component carrier with a highest or lowest frequency point as the default uplink primary component carrier.10. The device according to claim 9, wherein the circuitry is configured to receive PITCH signals from the user terminal on the uplink component carrier.11. The device according to claim 9, wherein the first node is a macro base station and the second node is a low power node (LPN).12. The device according to claim 9, wherein the first node operates at a first frequency and the second node operates at a second frequency higher than the first frequency.13. The device according to claim 9, wherein the communication includes receiving, using the circuitry, uplink control signaling via the uplink component carrier to control transmissions between the user terminal and the first node.14. The device according to claim 9, wherein the communication includes receiving the PUCCH via one of Media Access Control (MAC) signaling or physical layer signaling.15. The device according to claim 9, wherein the communication includes aggregating multiple component carriers.16. The device according to claim 9, wherein the first node and the second node are in a common baseband with each other.17. A method of performing wireless communication with a user equipment with multiple component carriers, the method comprising:obtaining an uplink component carrier associated for receiving Physical Uplink Control Channel (PUCCH);receiving an uplink control signaling on the PUCCH via an uplink component carrier;transmitting, via Radio Resource Control (RRC) signaling, designation information regarding an uplink primary component carrier to override an uplink primary component carrier set as a default uplink primary component carrier by the user equipment;obtaining an uplink component carrier with a highest or lowest frequency point as the default uplink primary component carrier; andreceiving, using the circuitry, Physical Uplink Shared Channel (PUSCH) signals together with the PUCCH via the uplink component carrier.18. The method according to claim 17, further comprising:receiving PUCCH signals from the user terminal on the uplink component carrier.