Information indicating to which UE or UEs PDSCH data is to be transmitted, information indicating how UEs are to receive PDSCH data, and information indicating how UEs are to perform decoding are contained in the PDCCH. For example, it is assumed that a specific PDCCH is CRC-masked with a Radio Network Temporary Identity (RNTI) “A” and information about data, that is transmitted using radio resources “B” (e.g., frequency location) and transport format information “C” (e.g., transmission block size, modulation scheme, coding information, etc.), is transmitted through a specific subframe. In this case, a UE located in a cell monitors the PDCCH using its own RNTI information. If one or more UEs having the RNTI ‘A’ are present, the UEs receive the PDCCH and receive the PDSCH indicated by ‘B’ and ‘C’ through the received PDCCH information.
FIG. 6 illustrates the structure of an uplink subframe used in the LTE system.
Referring to FIG. 6, an uplink subframe is divided into a region to which a PUCCH is allocated to transmit control information and a region to which a PUSCH is allocated to transmit user data. The PUSCH is allocated to the middle of the subframe, whereas the PUCCH is allocated to both ends of a data region in the frequency domain. The control information transmitted on the PUCCH includes an ACK/NACK, a CQI representing a downlink channel state, an RI for Multiple Input and Multiple Output (MIMO), a Scheduling Request (SR) indicating a request for allocation of uplink resources, etc. A PUCCH of a UE occupies one RB in a different frequency in each slot of a subframe. That is, two RBs allocated to the PUCCH frequency-hop over the slot boundary. Particularly, FIG. 6 illustrates an example in which PUCCHs for m=0, m=1, m=2, and m=3 are allocated to a subframe.