白丝美女被狂躁免费视频网站,500av导航大全精品,yw.193.cnc爆乳尤物未满,97se亚洲综合色区,аⅴ天堂中文在线网官网

Power supply control device and power supply control method for component supply device

專利號
US11051439B2
公開日期
2021-06-29
申請人
FUJI CORPORATION(JP Chiryu)
發(fā)明人
Yoshiyuki Fukaya; Kazuya Matsuyama; Hisato Sawanami; Toru Takahama
IPC分類
H05K13/00; H05K13/04; H05K13/08; G05B15/02
技術(shù)領(lǐng)域
feeders,tape,current,itot,supply,feeder,operation,icap,section,device
地域: Chiryu

摘要

A power supply control device for controlling a consumption current supplied from a power supply device to a tape feeder loaded on a component supply device, the component supply device being exchangeably loaded with multiple of the tape feeders, the power supply control device including: a consumption current acquiring section configured to acquire the consumption current corresponding to a state of the multiple tape feeders; a total consumption current calculating section configured to calculate a total consumption current that is a total of each of the consumption currents of the multiple tape feeders; and an operation controlling section configured to control the specified operation of the multiple tape feeders within a range in which the total consumption current does not exceed an output current capacity of the power supply device.

說明書

Accordingly, when an instruction for operation is received for multiple tape feeders 10, many tape feeders 10 can be made to operate in accordance with the priority order such that total consumption current Itot is within a range that does not exceed output current capacity Icap.

Further, tape feeders 10 include first feeding motor 131 and second feeding motor 141 configured to feed carrier tape with tape electronic components from a supply reel, and the specified operation includes loading operation of loading the leading end of the carrier tape by driving first feeding motor 131 and second feeding motor 141, component supply operation of supplying components by driving first feeding motor 131 and second feeding motor 141 in a pitch-feeding manner, and unloading operation of ejecting the carrier tape from the tape feeder 10 by reverse-driving first feeding motor 131 and second feeding motor 141.

Accordingly, component supply operation of tape feeders 10 with a high priority can be performed with the highest priority, and loading operation that relates to component replenishment of tape feeders 10, which have medium priority, can be performed with the next highest priority. Accordingly, board production operation of component mounter 9 is interrupted less frequently, and production efficiency of boards is improved.

7. Application of Power Supply Control Device 2A of Component Supply Device 1 of a Second Embodiment

權(quán)利要求

1
微信群二維碼
意見反饋