FIG. 25 is an example for applying option 2 of method 1 and alternative 3 in case 2. There are two SR configurations and two control channels (in front part and arrow means numerology can be scheduled by the control channel). Each SR configuration is associated with one uplink data numerology need. When the UE performs SR transmission in the second transmission opportunity of the SR configuration on the top, the UE will monitor the control channel in deep grey because the control channel is associated with the SR configuration 1.
FIG. 26 is an example for applying option 4 of method 1 and alternative 3 in case 1. There are two SR configurations and two control channels (in front part and arrow means numerology can be scheduled by the control channel). Each SR configuration is associated with one uplink data numerology need. When the UE performs SR transmission in the second transmission opportunity of the SR configuration on the top, the UE will monitor the control channel in deep grey because the control channel is default control channel.
FIG. 27 is an example for applying Alternative 1 on all control channel(s). In particular, FIG. 27 illustrates a one-to-one mapping between a control channel and scheduling of data numerology. As shown in FIG. 27, each control channel (shown as a deep grey portion) can schedule data transmission on specific numerology.