the second PDCCH monitoring occasion is after a first PDCCH monitoring occasion where the UE detects a DCI format 0_0 or DCI format 0_1 scheduling an earliest initial transmission of a transport block after a power headroom report was triggered or after the first uplink symbol of PUSCH transmission minus PUSCH preparation time as defined in subclause 6.4 of TS 38.214 [6] if the first PUSCH transmission is on a configured grant.
<END Text Proposal for TS 38.213 Section 7.7>
Note-1: The above change to specification for the PHR cut-off time may be sufficient for the case of single entry PHR (i.e., single carrier operation). In such a case, the UE implementation can determine the earliest PUSCH after PHR trigger without any confusion, e.g., as follows.
-
- In one example, once the UE has received a first/earliest UL DCI for initial transmission after PHR trigger, the UE will wait until:
- the first symbol of the PUSCH transmission corresponding to that first/earliest UL DCI after PHR trigger (to be called here “the first PUS CH”);
- minus a number of symbols equal to (i) the minimum of one or more of default, common, dedicated configured k2 value (i.e., DCI-to-PUSCH time) in symbols in the PUSCH time domain resource allocation table entries OR (ii) the minimum PUSCH processing/preparation time Tproc,2 as defined in [TS 38.214] for that serving cell.
- Then, during this monitoring/search time period: