白丝美女被狂躁免费视频网站,500av导航大全精品,yw.193.cnc爆乳尤物未满,97se亚洲综合色区,аⅴ天堂中文在线网官网

Method and apparatus for selectively applying the power adjustment of a transmit power control command

專利號(hào)
US11160028B2
公開日期
2021-10-26
申請(qǐng)人
Lenovo (Singapore) Pte. Ltd.(SG New Tech Park)
發(fā)明人
Ebrahim MolavianJazi; Hossein Bagheri; Hyejung Jung; Vijay Nangia; Joachim L?hr; Ravi Kuchibhotla
IPC分類
H04W52/14; H04L1/18; H04W52/36; H04W72/04; H04W72/12; H04W24/10; H04W72/14
技術(shù)領(lǐng)域
phr,pusch,ue,dci,ul,headroom,uplink,earliest,power,in
地域: New Tech Park

摘要

A method and apparatus provide for receiving a transmit power control command related to a physical uplink shared channel transmission having more than one scheduled transmission repetitions. An applicability of at least a portion of a power adjustment to less than all of the repetitions of the physical uplink shared channel transmission is determined. The physical uplink shared channel transmission is transmitted during each of the more than one scheduled transmission repetitions, wherein the at least the portion of the power adjustment is selectively applied as determined to the specified less than all of the more than one scheduled transmission repetitions.

說明書

  • “earliest available” means the ultimate earliest. It can be identified without confusion only for the case of same min{k2} or {T_proc,2} equal across all cells
  • “earliest possible” can mean the earliest within the best possible monitoring/search time window—which is the min{k2} for the cell that receives the earliest UL grant
  • Considering TA aspects:
    • If (min{k2}) values are different across cells, then use a function of min{k2} values such as the largest (maximum) value of min{k2}, in determining the earliest PUSCH/the first uplink symbol of the earliest PUSCH, the effect of timing difference between component carriers as given in [TS 38.133] is included.
  • Balanced PHR timeline (version 1): report PHR on the earliest possible PUSCH, based on a monitoring/search time window defined in terms of a reported UE capability and/or gNB configuration or fixed timing threshold in the specification, which is potentially (much) less stringent that the aggressive PHR timeline described above. The PHR cut-off time is the reception time of the corresponding UL DCI/time-reference.
    • Values for the UE capability between the first DCI and the min (k2) values/minimum PUSCH preparation time.
    • Alternatively, the values for the UE capability varies between min (k2) values to max (k2) values; wherein min(.) and max(.) operators can be for each serving cell or over all serving cells.
  • 權(quán)利要求

    1
    微信群二維碼
    意見反饋