The six print jobs #21 to #26 handled in
In the present exemplary embodiment, as illustrated in
Therefore, the print jobs #23, #25, and #24 are allocated to the rolled paper #21, and the print jobs #21, #22, and #26 are allocated to the rolled paper #22.
For example, in the case of the rolled paper #21, the print speed of the print job #24, among the allocated print jobs, is the lowest. Therefore, the print speed for the rolled paper #21 is determined as 80 meters/minute. A speed of 80 meters/minute is the same as the maximum transport speed of the image forming apparatus 10 (see
In this case, it takes 1 hour 46 minutes 15 seconds to print the print jobs #23, #25, and #24 allocated to the rolled paper #21.