determining, by a base station, a subsequent scheduling unit used by an uplink control channel and/or a position of a symbol used by the uplink control channel in the subsequent scheduling unit according to the number of scheduling units occupied by the uplink control channel of a user equipment, a start scheduling unit used by the uplink control channel, a start symbol position of the uplink control channel in the start scheduling unit and the number of symbols used by the uplink control channel in the start scheduling unit, and an agreed rule.
An embodiment of the present disclosure also provides a computer readable storage medium storing one or more programs, which are executed by one or more processors to implement any one of the foregoing steps of the method for determining an uplink control channel scheduling unit.
An embodiment of the present disclosure also provides a method for determining an uplink control channel scheduling unit, which includes the following steps:
determining, by a user equipment, a subsequent scheduling unit used by an uplink control channel and/or a position of a symbol used by the uplink control channel in the subsequent scheduling unit according to the number of scheduling units occupied by the uplink control channel, a start scheduling unit used by the uplink control channel, a start symbol position of the uplink control channel in the start scheduling unit and the number of symbols used by the uplink control channel in the start scheduling unit, and an agreed rule.