During the initialization operation (S400), the first device 110 may request termination information of the signal line 130 and/or a data line 830 (
The first device 110 may receive pull-down termination information of the signal line 130 and/or the data line 830 from the second device 120 (S420). For example, the ODT circuit 114a of the first device 110 connected to the signal line 130 and/or the data line 830 may be configured as a pull-up circuit connected to the power voltage VDDQ. The first device 110 may confirm that its ODT circuit 114a and the ODT circuit 124a of the second device 120 are in an asymmetric ODT state in which the ODT circuit 114a and the ODT circuit 124a are connected to different voltages.