In some feasible implementations, the first weak zone 811 may also be provided to accommodate overflowing fire prevention medium when the pressure relief structure 6 is actuated and the fire prevention medium flowing to the battery cell 400 overflows, to prevent the overflowing fire prevention medium from flowing into adjacent battery cells. As shown in
The main body 81 of the fastener 80 is further provided with a buckle 812, which are provided on two sides of the first weak zone 811 along a central axis of the fire prevention pipeline 70, and are configured to fasten the fire prevention pipeline 70 to the fastener 80, as shown in