For another example, in FIG. 3 and FIG. 5, the operation 310 and the operation 304 may be performed in a reverse order, or may be performed at the same time.
For another example, in FIG. 3 and FIG. 5, the operation 318 may be performed at the same time with the operation 314, or may be performed before transmitting the second privileged pairing notice, the second parameter P2, and/or a second field indication related to the second parameter P2.
For another example, in FIG. 4, the operation 408 may be performed at the same time with the operation 410 or the operation 412, or may be performed between the operation 410 and the operation 412, or may be performed between the operation 412 and the operation 210.
For another example, in FIG. 7, the operation 708 and the operation 616 may be performed in a reverse order, or may be performed at the same time.
For another example, in FIG. 8, the operation 806 and the operation 804 may be performed in a reverse order, or may be performed at the same time.
For another example, in FIG. 9, the operation 806 and the operation 904 may be performed in a reverse order, or may be performed at the same time.