As described above, following the RRC connection establishment procedure, the DU of IAB-node 1 and IAB-donor may proceed with F1 setup procedure using the F1-AP* protocol, which may activate one or more cells served by the DU of IAB-node 1—thereby allowing other IAB nodes and/or UEs to camp on the cell. In this procedure, the Adaptation Layer for IAB-node 1 and IAB—donor may be configured and activated as well.
Due to the nature of wireless communications, the wireless backhaul links are susceptible to be deteriorated or broken at any time. In aspects of the present embodiments, the MT part of an IAB-node may constantly monitor the quality of the radio link and/or signal quality on the upstream of the IAB-node, where the radio link may be to a parent IAB node/donor of the IAB-node. If radio problems cannot be recovered in a designated duration, the MT may declare Radio Link Failure (RLF), meaning a loss of communication link may have occurred or signal strength is weak to continue (e.g., below a threshold).