白丝美女被狂躁免费视频网站,500av导航大全精品,yw.193.cnc爆乳尤物未满,97se亚洲综合色区,аⅴ天堂中文在线网官网

Method and device for transmitting and receiving signals in wireless communication system

專利號(hào)
US12108388B2
公開(kāi)日期
2024-10-01
申請(qǐng)人
LG Electronics Inc.(KR Seoul)
發(fā)明人
Suckchel Yang; Seonwook Kim
IPC分類
H04W72/1268; H04W72/23
技術(shù)領(lǐng)域
pusch,slot,dci,puschs,symbol,duration,index,may,in,or
地域: Seoul

摘要

The method and device for transmitting and receiving signals in a wireless communication system, according to one embodiment of the present invention, comprise: receiving downlink control information (DCI) for scheduling a single physical uplink shared channel (PUSCH) or a plurality of PUSCHs to be transmitted on a serving cell; and transmitting the single PUSCH or the plurality of PUSCHs on the serving cell on the basis of the DCI, wherein the payload size of the DCI may be determined on the basis of the larger one of the number of bits of the pieces of information for scheduling the single PUSCH and the number of bits of the pieces of information for scheduling the plurality of PUSCHs.

說(shuō)明書

B. If (a×M)<=Gap<(b×M) (where, a>0 and b=a+1), a CBGTI fields are configured, the corresponding CBGTI is indicated/applied to a specific PUSCHs (or TBs) (for example, first PUSCH (or TB)).

i. Here, if a>=K, each CBGTI field may be configured/signaled to all of the K scheduled PUSCHs (or TBs).

(5) Embodiment 5

In the NR system, a plurality of (candidate) BWPs may be configured in the same serving cell. If the multi-slot PUSCH scheduling operation according to the embodiments of the present disclosure is configured in the corresponding cell, the maximum number of PUSCHs (or TBs) schedulable by a single DCI (or the number of transmission resources therefor) may be separately/independently configured for each BWP. Accordingly, the payload size of (dedicated) DCI corresponding to each BWP may be determined based on the maximum number of (schedulable) PUSCHs (or TBs) configured for the corresponding BWP, M. For example, the number of NDI and/or RV fields in the DCI may be set to M.

Thus, to dynamically change a (active) BWP based on the DCI in the above situation, handling may be required for switching between BWPs in which M is set to different values. Accordingly, when switching from BWP1 to BWP2 is indicated and the values of M for BWP1 and BWP2 are set to M1 and M2, respectively, if M1<M2, the following operations may be considered.

1) Option 1

A. The maximum number of PUSCHs (or TBs) schedulable by DCI (indicating BWP switching) may be limited to M1 (configured for BWP1).

B. Accordingly, the UE may operate on the assumption that scheduling for up to M1 PUSCHs (or TBs) is performed based on the corresponding DCI.

2) Option 2

權(quán)利要求

1
微信群二維碼
意見(jiàn)反饋