An example scenario 1000 associated with PHR is shown in FIG. 10. A UE may perform multi-TRP operation on TRP1 and TRP2 on a cell. At timing t1, the UE may receive, from a network, a UL grant 1002 for PUSCH transmission on TRP1. For example, the UL grant 1002 may schedule the PUSCH transmission on TRP1. The UL grant 1002 may not indicate a PUSCH transmission (e.g., any PUSCH transmission) on TRP2. For example, the UL grant 1002 may not schedule a PUSCH transmission (e.g., any PUSCH transmission) on TRP2.